JSC Messoyakhaneftegaz, 2018-2019
Construction and installation activities for the project “Development of West-Messoyakhsky and East-Messoyakhsky fields. Field Support Base, Temporary Accommodation Complex, Repair and Maintenance Base of Service Companies of East-Messoyakhsky field. Fuel and Lubricants Base, On-Site and Interconnecting Utilities”
The East-Messoyakhsky field is fully autonomous. Mobilization/demobilization of equipment is possible only viaa winter road in the period from January to the beginning of May. Air transport is the only way of communication with the work site in the remaining periods.
JSC ModulNefteGazEngineering performed the following under the project:
- Construction and installation activities;
- Full set of commissioning activities;
- Purchase and delivery of equipment and materials not included in the scope of Client’s supply.
The list of activities included preparatory activities, works on the site of the temporary accommodation camp, field support base, the site of fuel and lubricants base with a fuel filling station, works with linear facilities, other works and the stage of finalization.
Within the project JSC MNGE used 14 items of its own vehicles, including: vehicle-mounted cranes, semi-trailer trucks, low-bed semi-trailers, loader cranes, buses, excavators, loaders and a light vehicles with sides Mitsubishi L200.
Over 100 employees of JSC ModulNefteGazEngineering took part in the project.
Location: Yamal-Nenets Autonomous District