Gazpromneft-Zapolyarye, LLC, 2015

Re-location (dismounting, mobilization) of equipment from the pad of well No. 68 of Ignyalinsky License Area of Gazpromneft-Angara, LLC.

Installation and commissioning of a mobile test complex for wells development on the pad of well No. 321-14 within Chayandinsky oil, gas and gas condensate field of Gazpromneft-Zapolyarye, LLC, Republic of Sakha (Yakutia), including:

  • Site preparation (cutting, leveling, burial of slash, filling, landscaping).
  • Welding, installation, painting, electrical and heat insulation activities.
  • Commissioning activities.

Approximate list of equipment for the mobile well development and survey package (PKIOS):

  • Oil/gas separator (test separator) on wheels;
  • Storage vessel with a pump discharging liquid hydrocarbons to the horizontal flare, mounted on wheels;
  • Horizontal flare unit equipped with block valves and piping, mounted on wheels;
  • Flare unit for the disposal of liquid hydrocarbons, with 2 air compressors (operating + spare), water pump, mounted on wheels;
  • Line heater mounted on wheels;
  • Loading arm without a pump, on a single skid that can be transported on wheels;
  • Diesel power plant on wheels, with automatic transfer switches, 2 pcs.
  • Elastic tank for diesel fuel storage;
  • Control portacabin on wheels;
  • Dedicated wheels for interconnecting pipelines;
  • Interconnecting pipelines;
  • Electrical tracing system;
  • Block, control and safety valves;
  • Instruments;
  • Automated process control system (APCS).

TOTAL DURATION OF WORKS: 110-120 days.

Location: Republic of Sakha (Yakutia).

 