Production base
To render comprehensive services to its Clients, Joint-Stock Company ModulNefteGazEngineering has purchased a production base in the territory of Ufa. In such a way the company became able to not only render services for operation of Clients’ equipment, but also design and manufacture its own equipment.
The base of JSC MNGE has a total area of 13,500 m2, of which 4,000 m2 is warehouse premises.
There are railway tracks going to the base, which make it possible to load/unload equipment.
Head of the production base, Candidate of Engineering Science
Andrey YakupovJSC MNGE specializes in the manufacture of oil and gas treatment complexes. Despite individual peculiarities of each project, we constantly strive to optimize production technologies. At the moment the manufacture of a mobile complex, excluding the supply of raw materials, takes 60 to 90 days, depending on the complexity of an order.
List of equipment at the production base:
General-purpose thread-cutting machine TS-75
- The largest diameter of a disk-type workpiece above the bed – Ø 435 mm
- The largest diameter of a shaft-type workpiece above the support – Ø 224 mm
- Center-to-center distance – 1,000 mm
- Power of primary motion electric motor – 11 kW
- Trough hole in the spindle for bar work – Ø 55 mm
Magnetic drilling machine EUROBOOR ECO.32
- Maximum diameter of the end mill – 32 mm
- Maximum diameter of the twist drill – 13 mm
- Maximum diameter of the vertical drill – 35 mm
- Spindle vertical stroke – 150 mm
Airless paint sprayer Graco Gx21 – 1 pc., Graco Mark 10 – 2 pcs.
Welding machines
- Manual inverter Forsazh 200M – 2 pcs.
- Manual inverter Lincoln V350PRO – 2 pcs.
- Welding machine Synergic.PRO 350-4 S – 2 pcs.
Air plasma cutters
- Plasma cutting inverter WEGA CUT-60 – 1 pc.
- Plasma cutting inverter Aurora PRO AIRHOLD 42 – 1 pc.